Week 6 -> PSD Cut / FrameWork Stage 2
This weekend was a huge step for the general look and feel for this Theme. Where as last week I left everything at a very blank spot, this week has made a vast improvement on the visual aesthetics of the posting section, the sidebar and the loop.
Here is what I had last week. public.visualcoma.com and here is the final design comp.
The focus of this weekend was:
- Post Area
- Background Images
- Fonts
- Layout
- The Loop: The first two post come in full and the next 8 come in as Excerpts. There are now two custom fields attached so that I can have a specific Excerpt image and a Featured Post Image. (featured post section has not been created yet)
- Sidebar: Added specific headers for each section so that they all have their own feel.
Week 7 -> FrameWork WrapUp / Functionality Check :: Due 5-24-09
The Rules:
Every week on Saturday I’m going to spend about 5hrs or so Making an update. Weather it’s a Visual or Functional UpDate I’ll be posting the change here every Monday under this Cateogory VC-Construction.






















–
loving it.